Metal fabrication and job shops
Plan hundreds of unique work orders on the capacity you really have, keep subcontracted steps in sight and deliver on the date you promised.
Why a digital planning board
A metal shop runs hundreds of work orders at once, in small and changing batches, with outsourced steps in between. Planners end up chasing priorities instead of improving flow. Still planning in a spreadsheet? See when Excel stops working for production scheduling.
In make-to-order production, an order typically spends 95% of its lead time waiting and 5% being worked on. 24Flow attacks that waiting with a visual planning board, live status from the shop floor and lead time figures you can act on.
20%
15%
30%
Challenges in metal fabrication
Proof from the shop floor

















Kuyer Metaal
Mariasteen
Voortman
FAQ
Software that plans and tracks every work order in a metal shop. 24Flow schedules orders on the capacity you really have, releases only what can start and shows the status of every order on the shop floor, so lead times stay predictable.
It depends on how you plan today. At Mariasteen, planning went from 3 hours to 30 minutes, and CGK Group has 30 to 50% less planning admin.
Yes. 24Flow connects to SAP, Microsoft Dynamics 365 Business Central, Microsoft Dynamics 365 Finance and Supply Chain Management and Exact Online. Your ERP stays the system of record; 24Flow syncs orders and actuals and runs the shop floor. See all integrations
Yes. A machine shop has the same pattern as any job shop: many unique work orders, complex routings across machines and rush jobs every day. As machine shop scheduling software, 24Flow plans each operation on the real capacity of your machines and teams and gives operators their next job on screen.
Talk to our team